Skip to content Skip to footer

Elhamra Terminal

Elhamra Terminal

Storage Facilities

The facility includes eight (8) crude oil storage tanks with a total capacity of 2.76 million barrels (MMBBLS), comprising:

  • Six (6) tanks, each with a capacity of 250,000 barrels
  • Two (2) tanks, each with a capacity of 630,000 barrels

These tanks are connected to a new oil manifold, commissioned in 2018, to accommodate future expansion and replace the legacy system that had been in service since 1968.

Elhamra Terminal

New Crude Oil Storage Tank 7&8

Two new crude oil storage tanks, each with a capacity of 630,000 barrels, have been constructed to expand El-Hamra Terminal’s total storage capacity to 2.76 million barrels (MMBBL). This expansion enhances the terminal’s ability to receive and accommodate crude oil from the Western Desert.

  • Tank#7 in service since April 2022. 
  • Tank#8 in service since April 2023. 
Elhamra Terminal

Automatic Control System “DCS”

Digital Transformation at El-Hamra Terminal
As part of WEPCO’s digital transformation strategy, all operational facilities at El-Hamra Terminal were fully automated and modernized in March 2022, replacing the manual systems in use since 1968. The upgrade includes the integration of advanced technologies such as:

Elhamra Terminal

CRUDE OIL MARINE SHIPPING SYSTEMS

    1. Diesel Pump Station
      • The existing station includes two diesel-engine shipping pumps, with a combined capacity of 0.5 million barrels per day (MMBBLS/day), in service since 2014

 

  1. New Pumping Station
    To enhance El-Hamra Terminal’s export capacity, a new pumping station comprising six electrically driven pumps has been commissioned. This upgrade supports increased shipping capabilities of up to 1 million barrels per day (MMBBL/day) through the new Single Point Mooring (SPM) system and the new 36-inch subsea cargo line, inaugurated in August 2023.

3. Marine Loading SBM & Loading Pipelines

  • In Service since Nov. 2019
  • 150,000 DWT, handling 1 MMBBL/Day
  • WD: 26m, Draft 16 Meter &
    (Chinese Lantern Hose type)
  • 36” pipeline 9 Km
  • (0.5 Km Onshore + 8,5 Km Offshore)
  • 100,000 DWT, handling 0,5 MMBBL/Day
  • WD: 20m & Draft 12 Meter
  • (Lazy-S Hose Type)
  • 30” pipeline 7 Km
  • (2Km Onshore + 5 Km Offshore)
Elhamra Terminal

Transitioning to renewable energy

Towards Sustainable Development
In alignment with national sustainability initiatives and government development plans, El-Hamra Terminal has successfully integrated renewable energy solutions to meet its domestic power needs.

Solar Station

Elhamra Terminal

El-Hamra Terminal Laboratories

  • El-Hamra Terminal the first accredited laboratory in the Western Desert, certified in accordance with the internationally recognized standard ISO/IEC 17025:2017 for the Competence of Testing and Calibration Laboratories, through the Egyptian Accreditation Council (EGAC).
  • The laboratory is responsible for monitoring the quality of both received and exported crude oil and provides analytical services to sister companies operating in the Western Desert.
Contact information

Safwa Towers Smouha 14 May Street – Tower 1 and 2 Facing Horse Owners Club – Smouha – Sidi Gaber – Alexandria

(20) 3 4281100 – 4277036 – 4277038

Post No. 21519 C.R. 66704

Subscribe to the exclusive updates!

© Copyright Wepco 2026.