El-Hamra Terminal Expansion Project – 120 Acres Area
Location wepco projects
Project objective :
- Establishing an expansion area south of El-Hamra Terminal to increase the storage capacity of the terminal by adding storage tanks with the necessary facilities for them.
- El-Hamra Terminal Expansion project, to add 4 storage crude oil tanks with capacity 630,000 BBL for each tank.
- Phase (I):
Two Tanks Nos. (9) and (10) With Total Design Capacity 1.26 MMBBL to reach Total Design Capacity for Hamra Terminal (4.1) MMBBL. (Soil Investigation/ Fencing/ Common Utilities (electricity distribution station and a drain system)).
- Phase (II):
Two Tanks With Total Design Capacity 1.26 MMBBL to reach Total Design Capacity for Hamra Terminal (5.4) MMBBL.
Project contractor :
Petrojet Company
Date of completion of works :
2024